Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Asgari, S, Afshar, A and Madani, K (2014) Cooperative Game Theoretic Framework for Joint Resource Management in Construction. Journal of Construction Engineering and Management, 140(03).

Baccarini, D and Love, P E D (2014) Statistical Characteristics of Cost Contingency in Water Infrastructure Projects. Journal of Construction Engineering and Management, 140(03).

Blomberg, D, Cotellesso, P, Sitzabee, W and Thal, A E (2014) Discovery of Internal and External Factors Causing Military Construction Cost Premiums. Journal of Construction Engineering and Management, 140(03).

Bowen, P, Edwards, P, Lingard, H and Cattell, K (2014) Predictive Modeling of Workplace Stress among Construction Professionals. Journal of Construction Engineering and Management, 140(03).

Bowen, P, Edwards, P, Lingard, H and Cattell, K (2014) Workplace Stress, Stress Effects, and Coping Mechanisms in the Construction Industry. Journal of Construction Engineering and Management, 140(03).

Chai, C, de Brito, J, Gaspar, P L and Silva, A (2014) Predicting the Service Life of Exterior Wall Painting: Techno-Economic Analysis of Alternative Maintenance Strategies. Journal of Construction Engineering and Management, 140(03).

Chiang, Y H, Zhou, L, Li, J, Lam, P T I and Wong, K W (2014) Achieving Sustainable Building Maintenance through Optimizing Life-Cycle Carbon, Cost, and Labor: Case in Hong Kong. Journal of Construction Engineering and Management, 140(03).

Cirilovic, J, Vajdic, N, Mladenovic, G and Queiroz, C (2014) Developing Cost Estimation Models for Road Rehabilitation and Reconstruction: Case Study of Projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(03).

Fan, S (2014) Intellectual Property Rights in Building Information Modeling Application in Taiwan. Journal of Construction Engineering and Management, 140(03).

Gao, T, Ergan, S, Akinci, B and Garrett, J H (2014) Proactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews. Journal of Construction Engineering and Management, 140(03).

Jafarzadeh, R, Wilkinson, S, González, V, Ingham, J M and Amiri, G G (2014) Predicting Seismic Retrofit Construction Cost for Buildings with Framed Structures Using Multilinear Regression Analysis. Journal of Construction Engineering and Management, 140(03).

Karan, E P, Sivakumar, R, Irizarry, J and Guhathakurta, S (2014) Digital Modeling of Construction Site Terrain Using Remotely Sensed Data and Geographic Information Systems Analyses. Journal of Construction Engineering and Management, 140(03).

Leung, M, Yu, J and Chan, Y S (2014) Focus Group Study to Explore Critical Factors of Public Engagement Process for Mega Development Projects. Journal of Construction Engineering and Management, 140(03).

  • Type: Journal Article
  • Keywords: Decision making; Public participation; Project management; Construction management; Focus group; Logical decision-making process; Public engagement; Team behaviors; Organizational issues;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000815
  • Abstract:
    Due to the dynamic nature of construction projects, multiple stakeholders with various expectations are often involved. To achieve consensus among different stakeholders, public engagement (PE) is increasingly adopted for mega development projects. However, it is really difficult to satisfy various stakeholder needs if PE is inappropriately conducted. PE has been criticized for its illogical and unsystematic processes underlying decisions. Hence, the current study aimed to explore and identify critical factors of the PE process in order to improve final performance. To achieve this aim, four focus groups were held involving different types of stakeholders (e.g., governmental departments, construction professionals, interest groups, and local residents). PE process factors, addressed in the focus groups, fell into two main categories: logical decision-making process and team behaviors, with the latter divided into task and personal dimensions. The results of the current study were used as the first stage of a comprehensive study aimed at improving PE performance. Several practical recommendations for facilitating the PE process were also pointed out in the group discussion, such as the application of logical and systematic decision-making processes, the establishment of effective evaluation methods and frameworks for evaluation criteria, and the usage of transparent and equal discussion rules.

Malone, E K and Issa, R R (2014) Predictive Models for Work-Life Balance and Organizational Commitment of Women in the U.S. Construction Industry. Journal of Construction Engineering and Management, 140(03).

Oviedo-Haito, R J, Jiménez, J, Cardoso, F F and Pellicer, E (2014) Survival Factors for Subcontractors in Economic Downturns. Journal of Construction Engineering and Management, 140(03).